Budhi Gandaki Hydroelectric Project (BGHEP)
Posted Date: December 27, 2024
Budhi Gandaki Hydroelectric Project (BGHEP)
Capacity
341 MW
Project
Semi Reservoir Peaking Run-of-the-River (PROR)
Project Location
Longitudes: 84°55’15” E to 84°52’40” E
Latitudes: 28°17’00” N to 28°22’00” N
The headwork’s within the Manaslu Conservation Area, Chumnubri 3 (Sirdibas), Dharche 1(Kerauja) and Dharche 3 (Uiya)
Project Status
Underway to Start