Budhi Gandaki Hydroelectric Project (BGHEP)

Budhi Gandaki Hydroelectric Project (BGHEP)

Capacity

341 MW

Project

Semi Reservoir Peaking Run-of-the-River (PROR)

Project Location

Longitudes: 84°55’15” E to 84°52’40” E

Latitudes: 28°17’00” N to 28°22’00” N

The headwork’s within the Manaslu Conservation Area, Chumnubri 3 (Sirdibas), Dharche 1(Kerauja) and Dharche 3 (Uiya)

Project Status

Underway to Start